Epoxy Flooring & Industrial Floor Coating Contractors in Karachi
Seamless, dust-free and chemical-resistant floors for factories, warehouses, power plants and homes. Survey, supply and application โ all from one team.
Is your floor costing you money?
A worn concrete floor doesn't just look bad โ it hurts your production, your safety record and your audits.
Get It Fixed- Concrete dust settling on products and machines
- Cracks and potholes on forklift routes
- Oil and chemical stains that won't come off
- Slippery floors that cause accidents
- Objections during audits and HSE inspections
- Repair costs that come back every year
Flooring Solutions We Apply
Every floor system is designed around its load, traffic and chemical exposure.
Epoxy Floor Coating
Dust-proof, glossy and easy-to-clean coating for factories, showrooms and parking areas.
Explore Service โSelf-Leveling Epoxy
2โ5 mm seamless, heavy-duty floors for pharma, food, labs and high-traffic production halls.
Explore Service โTennis Court Coating
Cushioned, weather-resistant sports surfaces with professional line marking.
Explore Service โHelipad Coating & Marking
Anti-skid, fuel-resistant helipad coating with standard H, TLOF and circle markings.
Explore Service โAnti-Slip Floor Coating
Textured non-slip finish for ramps, wet areas, walkways and plant floors.
Explore Service โFloor & Line Marking
Forklift lanes, safety zones, parking bays and warehouse rack marking.
Explore Service โBuilt for Your Site
From factories to homes โ every site has different demands.
Factories
Heavy machinery, chemical resistance and dust-free production floors.
Learn More โWarehouses & Godowns
Forklift traffic, abrasion resistance and clear line marking.
Learn More โPower Plants
Oil-spill resistance, anti-slip surfaces and HSE-compliant systems.
Learn More โHomes
Garages, porches, roof terraces and 3D / metallic decorative epoxy.
Learn More โWhat Goes Into Your Floor
Every layer has a job. No shortcuts โ that's why our floors last for years.
| System | Thickness | Best For |
|---|---|---|
| Epoxy Roller Coat | 300โ500 micron | Light traffic, stores, homes |
| Epoxy Mortar / Screed | 1โ2 mm | Warehouses, forklift areas |
| Self-Leveling Epoxy | 2โ3 mm | Pharma, food, production halls |
| Heavy-Duty SL | 3โ5 mm | Heavy machinery, power plants |
Brands We Apply
Authorised dealer material in sealed packing, applied exactly as per the manufacturer's TDS.
From Survey to Handover
A clear timeline, fixed scope and updates at every stage.
Site Survey
Free visit, moisture test, area measurement and floor condition check.
Quote & System
The right system, thickness and a fixed price based on load and use.
Surface Prep
Grinding or shot blasting, crack repair and thorough cleaning.
Application
Primer, body coat and top coat โ applied by a trained crew with proper tools.
Cure & Handover
Proper curing, final inspection and a warranty certificate.
Floors We've Delivered
Real projects, real clients.
The Right Floor for Every Need
Every site is different. Tell us your area and floor condition on WhatsApp and we'll recommend the right system with a quote.
Self-Leveling Epoxy
- 2โ3 mm seamless floor
- Grinding + crack repair included
- Factories, pharma, food
Anti-Slip / Heavy Duty
- Textured anti-skid finish
- Oil & chemical resistant
- Power plants, ramps, helipads
Special packages available for large projects (10,000+ sq ft).
Corporate & Vendor Information
A registered company with proper invoicing and documentation. Vendor registration documents are available on request.
Common Questions
How much does epoxy flooring cost per sq ft in Karachi?
Cost depends on the system and thickness. Roller coat systems are the most economical, while 2โ3 mm self-leveling costs more. We give an exact quote after a free site survey.
How long does the application take?
Typically 1,000โ3,000 sq ft is completed in 3โ5 days, including curing. Large sites can be done in phases so your production doesn't stop.
How long does an epoxy floor last?
With proper surface preparation and the right system, an industrial epoxy floor lasts for many years. Its life depends on traffic, chemicals and maintenance.
When can we use the floor after application?
Light foot traffic is usually allowed after 24 hours, and heavy traffic or forklifts after 5โ7 days, as per the product TDS.
Can you work on old or cracked floors?
Yes. We first repair old floors with grinding, crack filling and epoxy mortar, then apply the coating.
Do you give a warranty?
Yes, every project comes with a written workmanship warranty. The duration depends on the system.
Get Your Floor Quote in 24 Hours
Fill in the form โ your details go straight to our team on WhatsApp.
- Free site visit across Karachi
- Genuine branded material
- Fixed written quote โ no hidden charges
- Written workmanship warranty